Abstract

Industrialized Building System (IBS) is a system where the components of the building are manufactured in a factory and it will be transported to the site to form the structures. The supply chain management (SCM) is a system where the delivery flows of the IBS products from manufacturers to the site. The aim of this research is to identify the major challenges and to analyze the issues on IBS implementation in SCM in Klang Valley from the manufacturers perspective. The methodology used in this paper is based on primary data through questionnaire and interview. Questionnaires were sent to the Manufacturers. It can be concluded that this paper attempts to present more on the challenges and issues that those companies of manufacturers faced during their success journey in finding integration in their supply chain. The main contributions of this paper are integrating all the supply chain integration challenges and issues on IBS. Therefore, these contributions will be helpful for the organization of manufacturers and IBS players that establish the integration in their SCM.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.