Abstract
A sustainable-energy policy requires the development of economical and sustainable renewable energy systems. This research focuses on the feasibility of developing a sustainable resource supply chain plan, by using available biomass as a resource for producing electricity in the Loei province, Thailand. A mathematical model has been proposed to determine suitable locations for the biomass power plants, the optimal biomass production, and supplier allocation that result in the lowest operating cost to meet the electricity demand. The availability of different types of biomass, different modes of transportation, and electricity consumption in the Loei province is used to develop the optimisation model. An extended model is also proposed to deal with the perishability of biomass. The proposed models can be used and applied by decision makers to perform different types of analysis in order to assist decision making on the location of biomass plants as well as in the distribution plan.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Logistics Systems and Management
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.