Abstract

In order to explore the impact of upstream structural on supply chain design, Taking into consideration that the relationship between bill of material (BOM) and multi-hierarchical suppliers, based on the supply chain design with single supply hub model, this paper extended to establish supply chain design models with two supply hubs from the model with single Supply Hub. These mixed integer programming (MIP) models were computed by using combined genetic algorithm. The experiment found that the total cost and inventory level of supply chain design with two supply hubs were lower than those with single supply hub, and could restrain dasiaBullwhip effectpsila more efficiently than that without supply hub.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.