Abstract

In the real world, there are a large number of supply chains that involve the short lifespan products. In this paper, we consider an integrated production and distribution batch scheduling problem on a single machine for the orders with a short lifespan, because it may be cheaper or faster to process and distribute orders in a batch than to process and distribute them individually. Assume that the orders have the identical processing time and come from the same location, and the batch setup time is a constant. The problem is to choose the number of batches and batch sizes to minimize the total delivery time without violating the order lifespan. We first give a backward dynamic programming algorithm, but it is not an actually polynomial-time algorithm. Then we propose a constant time partial dynamic programming algorithm by doing further research into the recursion formula in the algorithm. Further, using the difference characteristics of the optimal value function, a specific calculating formula to solve the problem with the setup time being integer times of the processing time is obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.