Abstract

Financial, environmental, and supply chain analyses of empty fruit bunch (EFB) biomass are needed for the development of a sustainable green chemicals industry in Malaysia. Herein, holistic analysis of the supply system and EFB life cycle cradle-to-gate are analyzed in an effort to make recommendations for the commercial-scale collection and delivery of EFB from crude palm oil (CPO) extraction facilities to biorefineries in Malaysia. Supply chain modeling tracked inputs and outputs for financial analysis. The openLCA software was used for life cycle assessment (LCA). Allocation scenarios were used to explore the impact of accounting methodologies on the competitiveness of EFB compared to other feedstocks. Sensitivity analysis on the effect of transportation distance, emission flows, and allocation methods on resulting environmental impacts were conducted. The No Burden, Economic, and Mass allocation scenarios resulted in 17, -2.3, and -265 kg CO2-eq. BD tonne-1 EFB global warming impacts (GW), respectively. Delivered cost for EFB was calculated to be approximately 45 US$ BD tonne-1. Environmental burdens were sensitive to allocation scenario, covered area, and land use change. Delivered cost was sensitive to transport distance, covered area, and yield. It was shown that there is sufficient Malaysia EFB available for between 9 and 28 biorefineries, depending upon the scale of production.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.