Abstract

A fuzzy-logic controlled super-capacitor bank (SCB) for improved load frequency control (LFC) of an interconnected power system is proposed, in this paper. The super-capacitor bank in each control area is interfaced with the area control bus through a power conversion system (PCS) comprising of a voltage source converter (VSC) and a buck-boost chopper. The fuzzy controller for SCB is designed in such a way that the effects of load disturbances are rejected on a continuous basis. Necessary models are developed and control and implementation aspects are presented in a detailed manner. Time domain simulations are carried out to demonstrate the effectiveness of the proposed scheme. The performance of the resulting power system under realistic situation is investigated by including the effects of generation rate constraint (GRC) and governor dead band (DB) in the simulation studies.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.