Abstract
Abstract The topic of indoor overheating in a modern and well-insulated building is investigated. A real case study is proposed, where, even if the summer ambient conditions are not extreme, thermal discomfort has been verified during the first years of operations. The office building, built recently in Berlin, fulfils the German requirements in matter of energy performance of buildings and heat protection in summertime. Active system for the space cooling are not installed. In the frame of the new international approach to the cost-optimality, by adopting the adaptive comfort criteria for naturally-ventilated buildings, strategies for improving the indoor conditions during the cooling season are here investigated, by analysing various typologies and management strategies for solar shadings.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.