Abstract

Abstract Pumping is the preferred placement method for concrete. The pumping process influences fresh properties of concrete. Competent producers handle these issues when composing the mix design. However, sudden changes in workability sometimes appear, both in the form of increased and decreased workability. Both changes might be handled on-site. However, even the situations that are sufficiently handled, cause delays and extra costs. Sometimes the final result’s quality is compromised, resulting in repairs and economic compensation claims. The extent and causes of incidents with sudden changes in workability are still to be investigated. It is suggested that around 1 100 000 m3 or 30% of concrete experience sudden change in workability annually in Norway, and that 200 000 kg of chemical admixtures is used on-site. It appears that the most relevant cause is to find within variations in the fine aggregate. Increase in workability might also be caused by lack of compatibility between superplasticiser and binding materials in low-carbon concrete, enhanced by the extra mixing process caused by the pumping process. To approach these questions, the Quality Assessment system of a medium-sized Norwegian concrete producer has been investigated. It comprises documentation of 1 500 000 m3 of concrete, over 10 years.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.