Abstract

The rapid economic expansion has spurred extensive construction near subway networks, impacting the stability of their track foundations. Consequently, it’s crucial to monitor and predict settlement in subway track foundations. However, the dynamic deformation patterns often exhibit nonlinearity and non-stationarity, posing challenges for traditional linear regression models. To tackle this, our study integrates the BiLSTM (bi-directional long short-term memory) network with the AdaBoost ensemble learning algorithm. Using settlement data from Shanghai metro monitoring points, the model is trained and evaluated employing R2 (coefficient of determination), MAE (mean absolute error), and RMSE (root mean square error). Results show that our proposed model displays superior predictive accuracy compared to the LSTM and the BiLSTM, with an average training set R2 of 0.99, test set R2 of 0.78, average MAE of 0.32 mm, and average RMSE of 0.4 mm. Consequently, for forecasting subway track foundation deformations, employing our network model ensures highly accurate predictive capabilities.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.