Abstract

In order to accurately predict the length of secondary cable laying in substation construction project and avoid the problem of resource waste in engineering construction, a secondary cable path optimization model based on 3D simulation and Dijkstra algorithm was established. Firstly, through the application of Bentley software, the three-dimensional model of substation is established, and the workflow of BRCM cable laying software is introduced. Secondly, the common and the improved Dijkstra algorithm are used to carry out the path planning on the raster map respectively, and the experimental simulation is carried out. Finally, the simulation results show that the path length of the improved algorithm is 24.32% and 28.66% less than that of the traditional Dijkstra. It is 12.34% less than that of the ant colony algorithm, which provides some useful theoretical references for the secondary cable laying in the future substations.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.