Abstract
In order to overcome the subjectivity and limitations of traditional substation site selection methods, and to achieve efficient and visualized substation site selection, this study conducted five candidate site locations to avoid the red line area in the geographic information system, then conducted a comprehensive evaluation of the site’s economics. Using the improved matter-element model, an evaluation index system for substation site selection was established covering four intermediate levels of poor geological treatment costs, vertical layout, policy compensation and special costs, and divided into five evaluation levels: excellent, good, average, and poor, Difference, and then determine each section domain and the object to be evaluated, use programming software to calculate the maximum correlation degree of the five areas to be selected for A, B, C, D, E are 0.9118, 0.8172, 0.9202, 0.9485, 0.8557. Respectively belong to the five levels of poor, general, general, poor, and general. Finally, in the GIS system, according to the economic efficiency of site selection from high to low, it corresponds to “cyan-blue, green, yellow, orange and red” in a gradual colour sequence for the five site selection areas Colouring. The results prove that this method has better early warning and auxiliary decision-making functions for substation site selection.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.