Abstract
For conventional subcarrier pairing schemes in cooperative orthogonal frequency division multiplexing amplify and forward multi-relay networks, to avoid interference, each subcarrier pair (SP) is assigned to only one relay. Over a specific subcarrier, the destination receives signals transmitted from only one relay. In our subcarrier pairing scheme, we assign each SP to all the relays. Thus, over a specific subcarrier, the destination receives signals transmitted from all the relays. Since it is assumed that there exists the direct link from the source to the destination, we assume that the source also transmits signals during the second time slot for the direct transmission mode. We propose an enhanced joint subcarrier pairing and power allocation optimization scheme which maximizes the transmission rate subject to total network power constraint. The problem is simplified and solved by using dual method. It is shown from simulation results that our proposed scheme outperforms the other schemes.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.