Abstract

Construction wastes have attracted more and more public attention with the development of the city construction. On the basis of summarizing the existing slurry treatment technologies in relevant area, a new slurry treatment process is proposed according to the characteristics of waste bored pile slurry. Three steps included in this process: slurry purification, flocculation and pressure filtration. A practical application is used to demonstrate the feasibility of this process. The results show that the slurry is disposed without pollution, achieving zero discharge of pollutants.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.