Abstract

The main role of studs, which act as connectors of the steel-concrete composite structures, is to ensure that the steel and the concrete work together as a whole. The studs in steel-concrete composite structures bear the shearing force in the majority of cases, but in certain locations, such as the mid-span of a simply supported composite beam, the studs bear axial uplift force. The previous studies mainly focused on the shearing performance of the stud by some experimental and theoretical effort. However, rare studies involved the uplift performance of studs. In this paper, the single stud uplift test on 10 composite specimens was performed. Meanwhile, based on the test, numerical analysis was introduced to simulate the concrete damage process due to the stud uplifted from concrete. The static ultimate bearing capacity, under which the stud connector was pulled out from the damaged reinforced concrete, is much larger than the cyclic ultimate bearing capacity, under which the weld joint between stud and steel plate fractured. According to the fatigue test results of 7 specimens, the fatigue S-N curve of the construction detail after minus 2 times standard deviation is logN = 24.011 - 9.171 logΔσ, the fatigue strength corresponding to 2 × 106 cycles is 85.33 MPa.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.