Abstract

AbstractThe propagation process of blasting vibration has always been a difficult problem affecting the stability of high slopes in open-pit mines. Taking the Jianshan Phosphorus Mine as the research background, combined with engineering geological investigation, field blasting test, blasting vibration monitoring, numerical simulation technology, and theoretical analysis, the three-dimensional dynamic stability of the adjacent high slope after blasting vibration was systematically studied. In our study, a small-diameter buffer shock-absorbing blasting technology near the slope was proposed, which greatly improved the production efficiency. Through regression analysis of a large amount of vibration test data, the law of blasting vibration propagation in Jianshan stope and Haifeng stope was obtained. In addition, by establishing four three-dimensional geomechanical numerical models, the slope’s own frequency, damping characteristics, and dynamic response acceleration distribution after detonation were studied, respectively. On the other hand, under the action of Ei Centro wave with 8-degree seismic intensity, the maximum total acceleration and maximum total displacement of the slope were calculated and analyzed. Both the explosion unloading of the 8-degree earthquake and the Ei Centro wave simulation results showed that the high slope near the Jianshan Phosphorus Mine was generally in a stable state. Thus, this study can provide technical support and theoretical guidance for mine blasting.

Highlights

  • During the production process of the open-pit mine, the blasting vibration effect threatens the stability of the slope and even leads to local or large-scale landslide accidents [1, 2]

  • Focusing on the blasting site monitoring of the top of the slope can effectively ensure the safety of the adjacent high slope after the blasting vibration

  • (2) Regression analysis is performed on a large number of blasting vibration test data, and the law of blasting vibration propagation in Jianshan stope, Haifeng stope, and adjacent high slopes is obtained

Read more

Summary

Introduction

During the production process of the open-pit mine, the blasting vibration effect threatens the stability of the slope and even leads to local or large-scale landslide accidents [1, 2]. In June 1981, a cavern blasting was carried out in the western part of the stope (total charge was 1,200 tons), and a large-scale landslide disaster of 4.16 million m3 occurred [5]. These landslide disasters have caused heavy casualties and property losses [6, 7]. It is necessary to develop blasting technology and blasting vibration for the open-pit of Jianshan Phosphorus Mine, which can ensure the safety

Results
Discussion
Conclusion
Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call