Abstract

Based on the current status of transmission and transformation project design management, the concept of lean design is highly integrated with the means of three-dimension design so as to innovate the new mode for the full-process design of transmission and transformation project, as well as construct the three-dimension design of power grid project with the features of Southern Hebei Power Network. Through the standardization construction of three-dimension design technology, lean construction of design quality and profound application construction of engineering practice, it is able to unify the design standard, enhance the design quality, rebuild the business process and deepen the design practice. This article realize the precise development of budge, as well as reach the targets of strengthening the engineering intrinsic safety and obtaining the good economic benefit.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.