Abstract

With the development of coal resource extraction and wellbore construction proceeding towards deeper depths, the stability of drilling wellbore structures has become increasingly severe, even posing a barrier to the use of drilling method technology in deep wellbore construction. To address this issue, this study raised an optimized constraints method involving pre-throwing cement slurry to the bottom before wellbore decent, altering bottom constraints. Firstly, the critical depth and instability criterion of this optimized method was derived by catastrophe theory. Subsequently, the role of single-factor and multi-factor sensitivity analyses on critical depth was discussed. The engineering effects of optimized constraint methods were contrasted and examined in several drilling projects. Finally, the characteristic values of real engineering were computed using numerical techniques and ABAQUS2020 software, and the efficacy of optimization approaches was examined and validated. The results revealed that the critical depth increased by 41.39 ± 5%. The influence factors described in order of the degree were the counterweight water height, the elastic modulus, the thickness of the wellbore, and the self-weight of the wellbore, sequentially. The conclusion on structural stability between the numerical calculation solution and theoretical calculation solution was completely the same. The optimized constraints method can effectively improve the stability of the wellbore structure.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call