Abstract

The ultimate depth of a scour pit downstream of a debris flow sabo dam is an important design parameter in determining the foundation bearing depth of a debris flow for Sabo dam. This paper considers the scour pit system as a black box, neglecting the energy consumed by inter-particle collision of debris flow and the collision between debris flow and the valley bed. A formula was developed for the ultimate depth of a scour pit using the energy method to establish debris flow energy changes in and out of scour pit, combined with the energy needed by sediment incipient. When the results of the formula are compared with a series of indoor flume experiments, the error ranged from 3.1% to 17.6%. The calculated and experimental values agreed well, indicating that the method based on the energy method is reasonable and feasible.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call