Abstract

Aiming at the geological characteristics of the upper soft and hard stratum in Chongqing area, taking the Hongyan Village Station of Metro Line 9 as an example, the excavation method of super-large section single-layer initial arch cover method is proposed. The finite element numerical simulation is used to analyze the horizontal and vertical displacement of the surrounding rock, the axial force and bending moment of the single-layer initial arch cover, and the axial force distribution of the anchor. It is concluded that the single-layer initial arch cover method can meet the control requirements of deformation and surface settlement of super-large section surrounding rock. The initial arch cover of H220 grill steel frame + φ25, L=4.5m hollow grouting anchor + 300mm thick C25 wet-sprayed concrete can meet the bearing capacity requirements and ensure the overall stability of the structure. The connection mode of the large arch and the side wall arch is optimized to ensure that the initial branch is completely closed and looped. Combined with on-site monitoring and measurement data, it is feasible to use a single-layer initial arch cover method at Hongyan Village Station.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.