Abstract

Cable-stayed bridges have their unique advantages, which are suitable for urban bridges with higher requirements for landscape improvement and upgrading. In the process of urban bridge renovation with landscape demand, the advantages of cable-stayed bridge in shape and structure are combined to provide more excellent scheme for urban bridge renovation. In this paper, the existing continuous girder bridge is reconstructed by adding cables. The internal force and displacement before and after structural renovation are calculated by Midas civil 2019. It can be seen that the internal force of the structure can be significantly improved by increasing the cables, and the maximum and minimum bending stress can be reduced by 40% and 20% respectively. Comparing and analyzing different retrofitting methods, the layout of cables has the most obvious effect on the maximum stress of the whole structure.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.