Abstract

In river planning, a design flood discharge has been decided based on runoff analyses of design storm hyetographs with a given return period. However, the design return period of the design flood discharge seldom coincides with that estimated statistically based on data of observed flood discharges. In this paper, the difference between the probabilities of the design flood discharges and design storm rainfalls is evaluated using a bi-variate probability theory.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call