Abstract

After studying and observing the hydraulic characteristics under different closure gap widths, the changes of various hydraulic factors, the rationality of the embankment zoning and dumped particle size, by simulating the whole closure process of the Yuliang Hydro-junction Project, a 1:100 overall hydraulic model test is adopted in this paper to put forward the scheme which is beneficial to the project closure, and provide scientific basis for construction organization design.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.