Abstract
Low pylon cable-stayed bridge is a new type of composite bridge between girder bridge and traditional cable-stayed bridge. Because of its good mechanical properties, economic benefits and beautiful shape, low pylon cable-stayed bridge is widely used in highway and urban landscape bridges. In this paper, a wide and low pylon cable-stayed bridge under construction is taken as the research background, and the numerical simulation model is established by using the finite element analysis software MIDAS CIVIL. The influence of the length of the cable-free zone is studied. By changing the length of cable-free zone at the tower root and the length of cable-free zone in the middle of span, the influence of the length of non-cable zone on the deformation, bending moment, internal force and cable force of low pylon cable-stayed bridge at the completion stage is studied. The reasonable value range of non-cable zone length is obtained. The research results will provide theoretical guidance for the design and construction of similar projects.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.