Abstract

The paper analyzed the present channeling and signal timing of the traffic organization methods by the field survey on Hohhot railway station signalized intersection, and studied traffic operational conditions under the present situations. In order to reduce control delay and queue length by left-turns generating disturb, this paper proposed protected-plus-permitted phasing left-turn operation and optimized with synchro simulation system. After optimizing, control delay and queue length are obviously lower. The same time, the paper made a suggestion on setting the facilities of pedestrians crossing the intersection.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.