Abstract

Take the county (district) as the unit, set up sample points for farmland quality survey in the construction area of high standard farmland, collect basic information data, collect soil samples, conduct field surveys, sample detection and analysis, and prepare evaluation reports to evaluate the quality of farmland before and after the construction of high standard farmland. At the same time, calculate and analyze the grain production capacity and production potential of the cultivated land in the construction area of high standard farmland, compare the difference of the cultivated land production before and after the construction of high standard farmland, and scientifically evaluate the construction effect of high standard farmland.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.