Abstract
The productivity of low-permeability reservoirs is affected by multiple factors. After the development of water injection by pressure drive, it will also be affected by factors such as construction, resulting in large differences in the productivity of different oil wells. According to reservoir engineering knowledge, the factors affecting the productivity of pressure drive water injection development are preliminarily determined. The conceptual model of pressure drive water injection development of low permeability reservoir is established by numerical simulation method. Combined with orthogonal design, the main control factors of pressure drive water injection development productivity are determined. The main control factors include injection production well spacing, water injection volume of pressure drive measures, water content before pressure drive, porosity, and quantitative analysis of the main control factors. Through correct analysis and evaluation of these factors, it provides guiding significance for the productivity prediction of pressure drive water injection development in low permeability reservoirs and the optimization of pressure drive water injection scheme.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.