Abstract
After the initial impoundment of the Baihetan Reservoir in April 2021, the water level in front of the dam rose about 200 m. The mechanical properties and effects of the bank slopes in the reservoir area changed significantly, resulting in many bank collapses. This study systematically analyzed the bank slope of the head section of the reservoir, spanning 30 km from the dam to Baihetan Bridge, through a comprehensive investigation conducted after the initial impoundment. The analysis utilized UAV flights and ground surveys to interpret the bank slope’s distribution characteristics and failure patterns. A total of 276 bank collapses were recorded, with a geohazard development density of 4.6/km. The slope gradient of 26% of the collapsed banks experienced an increase ranging from 5 to 20° after impoundment, whereas the remaining sites’ inclines remained unchanged. According to the combination of lithology and movement mode, the bank failure mode is divided into six types, which are the surface erosion type, surface collapse type, surface slide type, bedding slip type of clastic rock, toppling type of clastic rock, and cavity corrosion type of carbonate rock. It was found that the collapsed banks in the reservoir area of 85% developed in the reactivation of old landslide deposits, while 15% in the clastic and carbonate rock. This study offers guidance for the next phase of bank collapse regulations and future geohazards prevention strategies in the Baihetan Reservoir area.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.