Abstract

During selecting the routes, the application of RS and GIS is very significant to reduce the cost of project and forecast the future hidden trouble. In the case study of Guanling——Xingren highway in the Karst mountain area, the authors apply RS and GIS to evaluate the geological condition and feasibility of the project. The result confirms that the design of highway is feasible. The study indicates that we should pay attention to the enriched-water fault that is the greatest hidden trouble during the construction of highway in the Karst mountain area.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call