Abstract

The feasible traffic operation scheme of expressway reconstruction and extension project, based on the mode of maintaining traffic moving while project construction, is an important content of traffic organization design. Several typical two-lane or four-lane schemes are briefly introduced, which are suitable for expressway reconstruction and extension project with both sides widening in China. And combined with traffic organization and the construction technology, various types of feasible traffic operation schemes are given for SWOT analysis in three aspects such as traffic, engineering and social influence. Finally, through the analysis of the specific situation of the reconstruction and extension project, Hebei section of Beijing to Hong Kong and Macao expressway (G4) was studied.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.