Abstract

Anchor cable prestressing is one of the key factors in maintaining the stability of the supporting structure and controlling ground deformation. In order to further understand the influence of anchor cable prestress loss on the stability of the foundation pit, an underground station pit of Qingdao Metro Line 6 is taken as the engineering background, and numerical simulation research is carried out by using FLAC3D, which calculates the surface settlement, the deformation of enclosing piles, the support axial force, and the axial force of anchor cables in the process of excavation of the foundation pit and compares it with the on-site monitoring data, to get the law of the impact of prestressing force on the stability of the foundation pit in order to provide a reference for the design of the soil–rock Combined pit support system design and engineering construction to provide reference.