Abstract

Frequency influencing factors in small weak receiving power grid with wind power penetration during the disturbance of power shortage are analyzed in this paper, such as wind power penetration rate, wind turbine types, inertia control loop and wind power fluctuation. Based on the influencing factors above, in the light of the phenomenon of large dive depth and long duration of the frequency first swing after fault, the coordination scheme of load shedding and under-frequency load shedding based on the simulation system is proposed: load shedding time and load shedding ratio coordination scheme. Simulation results verify the correctness of the theoretical analysis and the rationality and feasibility of the coordination scheme proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.