Abstract

The complex building group is a building group which integrates residential, business and office. Study on the operation of buried tube heat exchanger (BHE) with 30%, 50%, 70% and 100% occupancy rate by numerical simulation under the condition of full operation of the business and office, the optimal operation control strategy of a hybrid ground-source heat pump (HGSHP) system with different occupancy rates can be obtained. The results show that: at low occupancy rate the optimal operation control of the heat pump system is to use the cooling tower in the valley load period (June and September) and the heat absorption of the buried tube in winter; While at high occupancy rates, opening the cooling tower when the temperature of the outlet of the BHE is 2 degrees centigrade higher than the temperature of the wet bulb at the corresponding time is the optimal operating strategy. This paper is based on the annual energy consumption and optimization of soil temperature rise, which has an important guideline value for the design and operation of HGSHP system in complex buildings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.