Abstract

With the oilfield developed to a later stage and its heterogeneity gradually becoming more serious, the adaptability of conventional profile control technologies for the reservoir becomes worse and worse. Therefore, the fitness of compatibility between combined patterns of profile control and target reservoir becomes an important factor for the efficient development of the oil field. Due to the importance of compatibility between the profile control and reservoir property, research on the remaining oil recovery with combined patterns of profile control and foam flooding were carried out. The experimental results showed that the combined profile control is highly consistent with the target reservoir. With a little lower initial viscosity (28.3–40.9 mPa·s), the channel plugging system is easy to inject. Due to the addition of a polymer, the reinforced foam is not easy to defoam when transporting in the pore throats of the core sample, and its spontaneous adaptability makes it match with the porous media of the formation automatically, which effectively prolongs the transporting distance for the foam in the deep part of the core sample. The segment plug with a gel-type profile control agent injected at the front stage is of great significance to the non-homogeneous reservoir, so it is necessary to inject a sufficient gel-type profile control agent into the high permeability layer to make it produce a seal. When the permeability differential was equal to 10, the maximum increase of oil recovery degree was 29.69%, and the development effect became worse after increasing or decreasing the permeability differential.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call