Abstract

Baringin Bridge is a steel bridge that connects between Baringin Village and Koto Lalang Village in Padang City, Indonesia. Baringin Bridge was made of steel frame construction using the Box Caisson type foundation, with 7.6 meters width and 60 meters length. This bridge was built with a semi cantilever method with temporary support using coconut tree trunks. The construction of Baringin Bridge was terminated due to flood in Baringin River on November 2, 2018, which causes the collapse of the temporary scaffolding. The flood made the bridge move away about 300 meters from its foundation. This study aims to find out the cause of the steel bridge collapse. The assessment was carried out to analyze the existing bridge construction, the cause of flooding, and flood discharging that occurred on November 2, 2018. The calculation of forces acting on the scaffold when the bridge collapsed was also conducted. The results of the study show that Baringin River discharge on November 2, 2018, was 407.17 m³/s with a river flow velocity of 1.45 m/s. The calculation results of the scaffold show that the bridge should be able to withstand forces arising from the weight of the steel frame and the flow of the river. However, the collision of the wood logs that hit the scaffold’s feet causes the collapse of the steel bridge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.