Abstract

With a large number of railroad and highway tunnels opening for operation, the diseases caused by hidden lining defects are increasing. The study of flow characteristics of freshly mixed concrete during tunnel lining casting is the key to revealing the formation mechanism of hidden defects. This paper revealed the location of blank lining formation by investigating the circumferential and longitudinal flow characteristics of concrete in the vault during tunnel pouring to provide suggestions for improving the quality of tunnel lining pouring for the various projects. This paper adopted the method of indoor testing, selected the suitable working conditions and flow parameters, validated the accuracy of the test with a numerical simulation, and simulated the secondary lining pouring process of the tunnel arch from the circumferential direction and longitudinal direction. This revealed the flow characteristics of the freshly mixed concrete in the process of pouring the arch lining. The flow of concrete in the arch lining was basically characterized by two major features which were similar to the flow in the pumping pipe and the layered flow. It also revealed the relationship between the concrete flow rate, flow distance, and the location of the formation of the blank lining risk zone with the slump of the concrete, the pumping pressure, and the radius of the tunnel.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call