Abstract
Based on Huolangyu tunnel of Mixing road, this paper researches the monitoring of ground surface vibration and the technology of controlled blasting. Monitoring and analysis results show: The ground surface vibration decline from constructed position to un-constructed position along tunnel excavation direction. The maximum ground surface vibration locates at the shallow position along tunnel cross section. The surface vibration velocity main vibration frequency has more than one advantage frequency, main vibration frequency concentration distribution in 20~40Hz low frequency band. Tunnel driving, the emphasis of the blasting vibration should focus on control of tunnel excavation area has the upper, lining structure and shallow buried in the influence of the surrounding rock; Tunnel through the surface buildings, cannot ignore already forming of blasting seismic effects of tunnel amplification and resonance effect.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.