Abstract

In view of the difficulty in solving the problem of coalbed methane drainage and mining connection in Wangpo coal mine, a new layout method of slotted hole and common hole is put forward by adopting the ultra-high pressure hydraulic slotting technology and combining with the characteristics of coal seam. The drilling construction technology and construction process are optimized. The amount of coal discharged by slotted hole is statistically analyzed, and the gas drainage concentration and extraction of common hole in slotted hole are investigated. The results show that the ultra-high pressure hydraulic slotting radius is 1.60m ∼ 2.26m, the average gas extraction concentration of slotted borehole is 54.88%, the pure gas extraction of slotted borehole is 51.4% higher than that of ordinary borehole, and the time of reaching the standard is 37.5% ∼ 50%. Therefore, the ultra-high pressure hydraulic slotting technology can better solve the problem of increasing permeability of low permeability coal seam, and provide a new way for the prevention and control of coal mine gas disaster.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.