Abstract

The optimal management of the manufacturing processes is achieved through a set of optimal decisions, which must be made for choosing the best way to follow, every time we find ourselves in a point from which several potential manufacturing paths start. A dedicated method, namely the Holistic Optimization Method has been already developed in this purpose, and validated in a number of studies based on artificial and real instances databases. In the current papers that approach the optimal management of the manufacturing processes, in order to estimate the consequences of a decision, are used known methods, such as: NN modeling, big data analysis, statistics, etc. In all these cases, the database size plays an essential role in terms of estimation quality. The present study aims to prove the feasibility of applying the Holistic Optimization Method when the decision-maker does not dispose of a consistent database. This can be a significant advantage relative to the other methods. The study is performed using an artificially generated instances database in the case of a turning process, and the results obtained are promising.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.