Abstract

Seepage failure is an important factor in causing dam-break of earth-rock dam, so the study of anti-seepage reinforcement for dilapidated reservoirs is always an important topic to earth-rock dam. Changli reservoir, since the completion, soil flow and failure by piping occur in dam slopes, the safety of downstream residents has been threatened both in life and property. Based on the comparisons of the effects of anti-seepage reinforcement schemes,the result shows that, for this clay dam, concrete cut-off wall can improve the seepage state obviously and has a higher operational stability. Thus, the concrete cut-off wall is designated as the recommended anti-seepage scheme for Changli reservoir.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call