Abstract

With continual development of smart grid construction, digital substation devices based on the specification IEC 61850, such as substation-area backup protection, have been widely applied. According to the “Technical requirements for the substation-area backup protection control device of the new generation of intelligent substation”, this paper put forward the debugging scheme of all digital network interface based on RTDS. Through the introduction of the RTDS software and hardware platform of the whole process building and commissioning, and by constructing substation simulation model and configuring GTNET-GSE card and GTNET-SV card, a closed-loop test system of substation-area backup protection device is completed, also this process development verification interface debugging method and configuration files have a certain practical value. The simulation of substation typical fault conditions and device data receiving processing mechanism can effectively meet the state grid enterprises standard Q/GDW11053-2013 for protection device test project requirements, and this test can significantly improve the smart substation integrated debugging efficiency.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call