Abstract

Aiming at the problems of bottom water coning and oil well flooding caused by the large impact of the early production strength of the Jurassic bottom water direct contact well in the Seventh Oil Production Plant. Carry out research on nitrogen foam control bottom water coning technology, mainly including: ①laboratory test to optimize foam system suitable for Jurassic system of No. 7 Oil Production Plant, determine injection concentration and optimal gas-liquid ratio; ②The nitrogen foam injection timing and shut in time were optimized by numerical simulation method; ③Summarize the field tests that have been carried out, and determine the optimal combination of parameters suitable for the Jurassic nitrogen foam pressure cone of No. 7 Oil Production Plant.