Abstract

Digital substations primary equipments make use of many intelligent primary equipment, for example, Electronic Transformers (including Electronic Voltage Transformers EVT and Electronic Current Transformers ECT,which meet the standards IEC 60044-7/8),intelligent switch and so on,digital substations secondary equipments include many IED(Intelligent Electronic Device). This thesis studys on the function,design,hardware and testing method of the testing system for real-time of communication of the digital substations secondary equipments.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.