Abstract

According to the engineering geological and hydrogeological condition of loess tunnel with large transection in the expressway from Datong to Hunyuan, and on the basis of the planned running speed of motorized vehicles in the loess tunnel, the excogitative parameters of tunnel support for relevant surrounding rock and its driving method have been put forth in this paper. The application of the presented new construction method for expressway loess tunnel has accomplished a great success.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call