Abstract

According to the engineering geological and hydrogeological condition of loess tunnel with large transection in the expressway from Datong to Hunyuan, and on the basis of the planned running speed of motorized vehicles in the loess tunnel, the excogitative parameters of tunnel support for relevant surrounding rock and its driving method have been put forth in this paper. The application of the presented new construction method for expressway loess tunnel has accomplished a great success.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.