Abstract

From the characteristics of rock damage, the mechanism of rock blasting into seam was discussed. Based on the joint mechanism of stress waves and explosive gases, the blasting method adopting slotted pipe charge structure in fault formation was studied, and the test results were used in Guanjiao tunnel of Qinghai-Tibet railway. The field tests show that the perimeter hole adopting slotted pipe charge structure improves the phenomenon of over-excavation in fault formation obviously.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.