Abstract

Based on Nanjing Yangtze River Tunnel project, the selection of segment lining of large profile underwater shield tunnel was analyzed. Considering from structure force, construction and economic, the comparison and selection for assembling modes, joint form, blocking modes, thickness and width of segment lining was carried out, The better segment lining structure was obtained. The study results can offer references for the design of segment lining of similar large profile underwater shield tunnel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.