Abstract
The integral abutment bridge (IAB) has been regarded as an efficient and effective seismic design in bridge structures by many civil engineers in recent years. In this paper, some advantages of IAB are shown. By comparing with the traditional abutments, the design of IAB can save the cost of those expansion devices in both the construction phase and maintenance phase. Moreover, the seismic performance of IAB is proved to be better for its unique advantages such as increasing integrity by cancelling the expansion joints and bearings, reducing the backfilling pressure, and limiting the rotation. Therefore, the application of IAB has been spread in many countries, especially in America. However, this paper also conducts some problems in the field of IAB which can be regarded as the potential research direction. The first is the delay of IAB’s application in China and the corresponding urgent requirement. The second is the absence of a unified specification. And the last is that the advanced-performance piles in the integral abutment are expensive. The information presented in this paper aims to help arise and expand the relative emphasis and research in the field of IAB.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.