Abstract
The development and management of power transmission and transformation project schedule is highly subjective, and the delay of construction period will bring risks and losses to all parties. With China’s power construction entering the period of structural adjustment and transformation, it has become a new trend of power development to adopt scientific project management methods to improve the risk management level of power transmission and transformation projects. This paper first identifies the schedule risk of power transmission and transformation projects, analyzes the correlation between schedule risks based on the risk chain theory, establishes the schedule risk evaluation model based on the improved risk chain, and makes an empirical analysis on the schedule risk assessment of a power transmission and transformation project, which has a good effect on quantifying the schedule risk of power transmission and transformation project.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Earth and Environmental Science
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.