Abstract

Based on the finite element analysis, the general mechanical property tests and the CTOD (crack tip opening displacement) test of the penstock in the third deviated hole, the GB/T19624-2004, that is the criterion of safety assessment for in-service pressure vessels containing defects suggested by China, is applied to assess the five weld defects in the penstock, which experienced the failure of the pressure test. The assessment results indicate that 1# defect and 5# defect could be accepted, while the other defects should be repaired. According to the assessment results, the defects over criterion in the penstock must be repaired. After the penstock was repaired, it was checked by the ultrasonic flaw detection again. And the results indicate that all weld joints including circumferential and longitudinal weld joints in the penstock around the pipe close in the third deviated hole are acceptable, what provides a scientific basis for the second pressure test and the safe operation of the High head hydropower station.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.