Abstract

In this article, the rock bolt reinforcement mechanism is discussed, and the gravity method as well as the finite element method for the bolted rock is presented. These methods are applied to study the gravity dam foundation of the Xiaoxi Hydropower Project, which is influenced by the presence of a large fault with a cracked zone over 180 m wide. Rock bolt reinforcement was used to improve the stability of the dam foundation, and the reinforcement parameters were determined from a semi-empirical equation controlled by in situ test. The stability analysis was conducted using the above methods, and the improvement in terms of deformation and stress as well as stability of the dam foundation due to the reinforcement is assessed. Rock bolt reinforcement was completed successfully, and the dam started normal operations in January 2008.