Abstract

Through the investigation, the design of the combination of the retaining structure and the main structure of the large-diameter shield shaft was summarized. Combined with the characteristics of the offshore shaft, considering the difficulty in implementing underwater pouring of high-grade underground diaphragm wall, through reasonably analyzing the characteristics of chloride environmental corrosion, a reasonable solution of supporting the temporary diaphragm wall to participate in anti-floating action is proposed. For the strictness of crack control in the chloride environment, it is proposed to use the frame beam as the purlins in the excavation stage, and the waterproof problem of the construction joint is better solved. Finally, the three-dimensional calculation results confirm the stress of lining wall is reasonable.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.